Home › Resources › Education
Featured in Inside Self-Storage

The Self-Storage Construction Timeline: Phases to Include and Strategies to Manage It Effectively

By Tom Landsberger, Director of Operations, Spartan Construction

A person viewing an online construction calendar

If you want a facility finished on time, on budget, and built to a high standard, you need a timeline that's both realistic and actively managed, not just a date on a contract. Self-storage projects involve a lot of moving parts and multiple stakeholders, and there's no shortage of ways things can slip. A well-structured schedule does real work: it makes cost forecasting more accurate, keeps resources available when they're needed, keeps the project compliant with regulatory requirements, and reduces the risk of costly disruptions. Our Director of Operations, Tom Landsberger, laid out exactly how we approach this for Inside Self-Storage.

Every phase has a realistic timeframe. Pre-construction, covering market research, site selection, land acquisition, design, and approvals, usually runs three to six months. The construction phase itself, site prep, demolition, soil work, excavation, and utility connections, typically takes one to three months. Structural construction, steel framing, roofing, and major mechanical and electrical systems followed by interior finishing, runs another three to six months. Closeout, the final approvals and client walkthroughs, adds two to six more weeks before the doors can open.

Knowing these benchmarks up front is what lets us catch a slipping schedule early, rather than explaining it away after the fact.

"Ensuring that happens requires that you set and follow an effective construction timeline."

Read the Full Article on Inside Self-Storage →